The pipeline inside the site
The NEXUS Gas Transmission line carries up to 1.5 billion cubic feet of gas a day. It crosses Textile Road between the 10455 and 10635 frontages and runs north across the U-M parcels and North Hydro Park. It then crosses the Huron River, drilled roughly 40 feet below the riverbed, near the Ypsilanti Community Utilities Authority (YCUA) tanks. The separate Enbridge Line 79 / Wolverine corridor runs about a mile south of Textile Road.
| Feature | Coordinates | Relation to site |
|---|---|---|
| NEXUS crossing of Textile Rd | 42.2032, −83.5524 | At the McKean Rd intersection, between 10455 and 10635 |
| NEXUS crossing of the Huron River | 42.2091, −83.5548 | East of Bridge Rd, at the YCUA tanks and North Hydro parking |
| Ford Dam | 42.2060, −83.5578 | Site's northwest corner |
| YCUA storage tanks | 42.2076, −83.5555 | ~270 m west of the pipeline |
| YCUA water works | 42.2104, −83.5455 | ~570 m east of the pipeline |
| Enbridge Line 79 / Wolverine corridor | 42.1885, −83.5524 | ~1.0 mi south of Textile Rd, separate corridor |
Under 49 CFR 192.903, a 36-inch line at 1,440 psig maximum allowable operating pressure has a potential impact radius of 943 feet, a band 1,885 feet wide along the whole pipe. That covers roughly half of the site's ~3,900-foot Textile Road frontage. The pressure figure is an assumption until it is checked against the FERC certificate. At 1,200 psig the radius is 861 feet.
Crossing markers confirmed on the ground on September 7, 2026 at the Textile/McKean intersection carry the operator's encroachment notice under 49 CFR 192.707: no construction of any kind on the right-of-way without company permission. That standing-access requirement is a problem for any secured perimeter.
Developable acreage, not total acreage
The university's own Regents Communication (approved June 12, 2025) prices the 124.68-acre parcel at 10455 and 10635 Textile Road at $65,000 per developable acre. The total is reported at about $8.1 million. The adjoining 19.82-acre parcel at 10221 Textile Road was bought separately for a flat $1,500,000 (Regents Communication, approved Oct. 17, 2024). Together the ~144.5-acre assemblage cost about $9.6 million, if all 124.68 acres counted as developable in the final sale.
- The legal easement corridor. A transmission easement of this class typically runs about 50 feet wide and forbids structures, deep foundations, and heavy permanent loads. Along the property that removes on the order of 1.5 to 2 acres (an estimate, not a survey figure), but it splits the buildable land into eastern and western pieces that cannot share continuous access or infrastructure.
- The federal impact radius. The 943-foot band is not a legal no-build zone. A facility housing classified federal research would still likely treat permanent occupied structures inside it as a siting risk, a far larger practical constraint than the easement itself.
The Regents Communication sets the rate but does not show the developable acreage or the final price. If the purchase agreement counted the full 124.68 acres, no deduction was made for the pipeline. That figure is worth requesting, because it shows whether U-M's site work identified the pipeline before the sale closed.
The land came from a railroad. Norfolk & Western still holds a parcel of record at the same 10635 address, so the pipeline easement may have been granted alongside the rail corridor. The Register of Deeds chain of title would settle that.
Source: independent siting analysis compiled September 6, 2026 from Washtenaw County GIS, OpenStreetMap, the EIA pipeline layer, and site photography. Not a survey.
NEXUS safety and compliance record
Unodorized gas segment
Under PHMSA docket PHMSA-2016-0009, NEXUS received a special permit waiving the federal odorant requirement (49 CFR 192.625) for 9.84 miles of pipeline, milepost 246.25 to 256.09, in Washtenaw County. On that stretch the gas carries no added warning smell. Whether the range includes the Textile Road and Huron River crossing still has to be confirmed against PHMSA's National Pipeline Mapping System (NPMS) milepost data.
Certificate docket
The FERC certificate proceeding is docket CP16-22: Draft EIS July 8, 2016; Final EIS Nov. 30, 2016; Order Issuing Certificate Aug. 25, 2017. Ypsilanti Township is already on the record: its "Report of Charter Township of Ypsilanti" was filed August 23, 2016 (accession 20160823-5178).
Landowner disputes, 2019 to 2024
Starting with a November 2019 "Response and Report of Unsuccessful Revegetation," a consulting firm filed repeatedly with FERC on behalf of individual Ohio landowners over buried construction debris, altered land contours, and failed restoration. Sen. Sherrod Brown's office forwarded several constituent complaints to FERC in late 2022. FERC issued an order rejecting the allegations of non-compliance in May 2024, about five years after the disputes began.
Legal challenges and public comment
Sierra Club intervened in 2016 and moved for summary disposition on NEPA grounds. "NEXUS Landowners" filed a request for rehearing of a July 2019 order. Coalition to Reroute Nexus, et al. v. FERC reached the Sixth Circuit in December 2017 and was dismissed in March 2018. EPA commented on the Draft EIS, and Food & Water Watch filed 279 individual comments opposing the pipeline in 2016.
PHMSA enforcement history
A search of PHMSA's operator enforcement lookup found no Corrective Action Order, Notice of Probable Violation, Warning Letter, or Notice of Amendment for NEXUS Gas Transmission as of the September 2026 check. The lookup returned results correctly for a control search ("Wolverine"), so the empty result is a real finding, not a tool failure. We report it because accuracy matters more than a stronger-sounding claim.
Separate permitting, no shared review
Textile Road is one of several data-center-scale proposals in the region, and no single agency reviews them together. The table lists projects independently confirmed by name as of late September 2026.
| Project | Location | Developer(s) | Permitting path | Status |
|---|---|---|---|---|
| U-M/LANL computing facility | Ypsilanti Township | University of Michigan, Los Alamos National Laboratory | Federal/university; exempt from local zoning and taxation | Preferred site named Aug. 2026; opposed |
| "The Barn" | Saline Township | Related Digital, OpenAI, Oracle | Michigan Public Service Commission plus township approval | Groundbreaking held June 2026 |
| Thor Equities / Form8tion campus | Augusta Township | Thor Equities (Form8tion) | Township rezoning; residents petitioned to put it to voters | Rezoning approved July 2025, then challenged. Current status unconfirmed; check the trackers on Nearby sites |
| Sansone Group proposal | York Township | Sansone Group | Township rezoning (deed restriction against data centers) | Withdrawn after township declined to modify the restriction |
| Meta-linked hyperscale campus | Howell Township, Livingston County | Unnamed (Meta-linked) | Township approval | Paused after community opposition |
Pittsfield Township is drafting a local data-center ordinance. In Lansing, Senate Bill 771 and separate House bills are pending, covering a possible moratorium, community-benefit guardrails, and limits on U-M's land-use authority. Each project answers to a different body, and no entity reviews the cumulative regional impact on power, water, or pipeline exposure.
Open questions and who has to answer them
- Board of Regents: Did the pre-purchase site analysis identify the NEXUS right-of-way, its pressure, and its impact radius? If so, publish it.
- LANL / NNSA / DOE: State the standard for siting a classified facility over a third-party pipeline easement with standing rights of entry, and say whether this site meets it.
- NEXUS / Enbridge / DT Midstream: Were they consulted? Has relocation, or an AC-interference study for the proposed ~110 MW substation 165 ft from the line, been requested?
- FERC / PHMSA: What class-location and integrity-management obligations would a facility of this scale trigger, and when does that review happen relative to construction?
- Ypsilanti Township / Washtenaw County: Produce the recorded pipeline easement, the chain of title on the Norfolk & Western parcel, and the exceptions clause of the March 2026 deed.
- PHMSA / NPMS: Confirm whether the odorant-waiver range includes the Textile Road and Huron River crossing.
Sources
- Independent siting analysis (compiled Sept. 6, 2026)
- U-M Regents Communication, June 2025 and October 2024
- PHMSA docket PHMSA-2016-0009
- FERC eLibrary, docket CP16-22
- ProPublica Pipeline Safety Tracker